0% 50% 100%
PEKERJAAN | : Pemb. Jamban 1 Unit |
KSM | : Bima (Air ruai) |
GPS | : S:01.87499 E:106.08676 |
APBN | : 3.000.000 |
SWADAYA | : 410.000 |
0% 50% 100%
PEKERJAAN | : Pemb. Saluran Drainase 150 m |
KSM | : Lombok (04 Air Penabis) |
GPS | : S:01.87392 E:106.08306 |
APBN | : 12.500.000 |
SWADAYA | : 2.500.000 |
0% 50% 100%
PEKERJAAN | : Pemb. Siring 280 m |
KSM | : Enggano (Jl. Enggano) |
GPS | : S:01.87079 E:106.08691 |
APBN | : 28.000.000 |
SWADAYA | : 2.180.000 |
Tidak ada komentar:
Posting Komentar